Browse by author
Lookup NU author(s): Dr John Lamont-Black, David Alder, Chris White
Full text for this publication is not currently held within this repository. Alternative links are provided below where available.
© The authors and ICE Publishing: All rights reserved, 2015. Repair of earthwork failures involving landslips represents significant expenditure across the UK highways network each year. Traditional engineering solutions involve excavation and import of new construction materials, resulting in waste requiring off-site disposal to landfill and a relatively high carbon footprint. Working for the Highways Agency in England, Amey proposed remediation of a failing embankment using the pioneering electrokinetic geosynthetic treatment technique. This innovative technique involves in-situ remediation of the failed soil masses rather than excavation and replacement, with the potential for reduced vegetation clearance and a much lower carbon footprint. This scheme is one of the first pilot schemes implementing the technique on a full scale remediation project and involved close collaboration between Amey, their contractors, the Highways Agency and Electrokinetic Ltd. This paper outlines the design and implementation aspects of the project and summarises the findings of the post construction verification.
Author(s): Jackson C, Lamont-Black J, Alder D, White C
Publication type: Conference Proceedings (inc. Abstract)
Publication status: Published
Conference Name: Geotechnical Engineering for Infrastructure and Development - Proceedings of the XVI European Conference on Soil Mechanics and Geotechnical Engineering, ECSMGE 2015
Year of Conference: 2015
Pages: 2007-2011
Print publication date: 11/09/2015
Acceptance date: 01/01/1900
Publisher: ICE Publishing
URL: http://www.icebookshop.com/bookshop_main.asp?ISBN=9780727760678
Library holdings: Search Newcastle University Library for this item
ISBN: 9780727760678