Browse by author
Lookup NU author(s): Dr John Kamara
Full text for this publication is not currently held within this repository. Alternative links are provided below where available.
Describes a study that exploits the potential of fuzzy systems in construction through the development of a decision support system which is capable of handling fuzziness in the collaborative decision-making process. The proposed system is intended to provide an objective and rational framework within which collaborative decisions can be made by virtual construction project teams. Given the often linguistic nature of the weightings ascribed by individual disciplines to decision criteria, the proposed system will utilise fuzzy systems theory to rank criteria and recommend an optimal decision alternative. Presents an example to illustrate how the proposed tool works.
Author(s): Yang HM, Anumba CJ, Kamara JM, Carrillo PM
Publication type: Article
Publication status: Published
Journal: Logistics Information Management
Year: 2001
Volume: 14
Issue: 5/6
Pages: 344-354
ISSN (print): 0957-6053
ISSN (electronic): 1758-7409
Publisher: Emerald Group Publishing Ltd.
URL: http://dx.doi.org/10.1108/EUM0000000006246
DOI: 10.1108/EUM0000000006246
Altmetrics provided by Altmetric