Browse by author
Lookup NU author(s): Dr David Todd, Emeritus Professor Pratyush Sen
Full text for this publication is not currently held within this repository. Alternative links are provided below where available.
As complexity and size of projects increase so do the problems associated with the scheduling and management of the design, manufacturing and assembly processes. In the context of large projects the ability to optimise the scheduling and allocation of these processes can also aid in tendering for contract as well as the management of the project itself. Many large projects will be constructed across distributed sites, each with their own capabilities and specific areas of expertise. Multiple sources may be needed to provide skilled personnel, raw materials, specialised components or facilities for the project, even whole sub-systems within a complex project may be contracted out for financial or time reasons. This paper demonstrates how a computational intelligence technique know as the Genetic Algorithm can be used to optimise design, manufacturing and construction schedules for multiple objectives such as minimising cost and time and maximising utilisation. The systems generates a number of near-optimal project scenarios from which a single solution can be selected and implemented by the project manager.
Author(s): Todd D, Sen P
Publication type: Article
Publication status: Published
Journal: Computers and Industrial Engineering
Year: 1999
Volume: 37
Issue: 1-2
Pages: 47-50
Print publication date: 25/10/1999
ISSN (print): 0360-8352
ISSN (electronic): 1879-0550
Publisher: Pergamon
URL: http://dx.doi.org/10.1016/S0360-8352(99)00021-2
DOI: 10.1016/S0360-8352(99)00021-2
Altmetrics provided by Altmetric